Why Most Machine Vision RFPs Are Written Badly (and How to Write a Good One)
8 MIN READ 19 November 2026By Calum Browne
What to put in a request for proposal, what to leave out and how to read the responses you get back
A badly written request for proposal does not get you a better price. It gets you a worse system, quoted by suppliers who are all guessing at something different. We read these most weeks. The good ones are a pleasure to quote. The bad ones force every supplier to make assumptions. No two suppliers assume the same thing, which is why the quotes that come back cannot be compared at all.
In machine vision an RFP is rarely a formal tender document. It is often an email, a one-page spec or a filled-in enquiry form. Whatever shape it takes, it is doing one job, telling a supplier enough about your problem that they can propose the right solution and price it with confidence. Most fall short of that. The reason is usually not laziness. It is that the person writing the RFP is often new to vision and does not yet know what a supplier needs to hear.
The mistakes we see most often
Almost every weak RFP shares the same handful of problems. They are simple to fix once you can see them.
Specifying a solution instead of a problem. An RFP that asks for a 5 megapixel camera and a ring light has already made the two choices that should be the supplier's to make. Describe the defect you need to catch or the measurement you need to take, not the kit you think will do it. The hardware is the answer, not the question.
No samples and no images. Nothing tells a supplier more than the real part. A few good and bad samples, or clear photographs of the defect at the scale that matters, are worth more than a page of description. Without them everyone is quoting blind.
No throughput or cycle time. The same inspection at two parts a minute and at forty parts a minute can be two completely different systems. Leave the speed out and the quotes will be priced for different machines.
Nothing about the environment. A clean laboratory and an oily press shop are not the same place for a camera. Temperature, vibration, dust, washdown, ambient light and the space you have all change the answer. Say where the system will live.
No definition of success. If the RFP does not say what good looks like, there is nothing to hold the finished system against. State the accuracy, the false reject rate you can live with or the measurement tolerance. That one line protects both sides.
The copy-paste tender. A procurement template written for buying pumps or PCs, dropped onto a vision problem, asks for all the wrong things and none of the right ones. Vision is bought on the application, not on a parts list.
What a good RFP includes
A strong RFP is not longer. It is sharper. Give a supplier these things and you will get back proposals you can actually compare. You will also get them faster.
The part and the problem. What the part is, what can go wrong with it and what you need the system to catch or measure. Lead with this, not with hardware.
Samples or clear images. Real good and bad parts if you can send them. Failing that, well-lit photographs that show the defect at the scale it matters.
The measurement or tolerance. The accuracy you need, in the units that matter. A tolerance in microns, a minimum defect size, a grading threshold. Be clear about what passes and what fails.
Throughput and cycle time. Parts per minute, or the time the system has to reach its decision. This one number drives most of the others.
The environment. Where it sits, the temperature and dust, the vibration, the ambient light, the washdown and the space available. Flag anything unusual early.
Integration and interfaces. How the result leaves the system, the PLC or line controller it talks to, the signals it must send and whether this is a new line or a retrofit into an existing one.
Success criteria and acceptance. How you will judge the finished system and sign it off. An agreed acceptance test on known samples prevents most disputes later.
Budget range and timeline. A budget band is not a weakness. It lets a supplier propose the right class of system instead of guessing. It also stops you comparing a premium solution against a bare minimum one. Say when you need it running too.
None of this needs to be long. A single page that answers these questions will take you further than ten pages that dodge them. If you want a realistic sense of the numbers before you start, our guide to what to expect to pay for machine vision engineering sets out the bands.
How to read the responses you get back
Once the quotes arrive, the temptation is to line them up by price and take the lowest. In vision that is often how projects go wrong. The cheapest quote is frequently the one that understood the problem least. A few things separate a strong response from a weak one.
The first is whether the supplier engaged with your problem or sent you a template. A good response refers to your part, your defect and your line. It asks questions. A supplier who comes back with searching questions before quoting is not being awkward. They are the one taking your application seriously.
The second is whether they have offered to prove it rather than simply assert it. In machine vision the only real way to know a system will work is to test it on your own parts. A proposal that includes a feasibility study or a sample trial is worth more than one that guarantees a result on paper. Lighting is the usual tell. If a proposal says nothing about how the part will be lit, it has skipped the hardest part of the job.
The third is the whole cost of owning the system, not the unit price. Integration, lighting, training, spares and support often cost more than the camera. A quote that lists only hardware is not cheaper. It is less complete. Ask what happens when a part changes, when a camera needs replacing in a few years or when the line moves.
Last, make sure you are comparing like with like. When responses differ wildly in price, it is usually because they are quoting different scopes, not because one supplier is greedy and another generous. A good RFP prevents most of this. Where it still happens, a short call to each supplier to line up the scope will tell you more than a spreadsheet ever will.
Red flags in a supplier proposal
A few things in a response should make you slow down and ask more.
A quote with no questions. If a supplier priced a serious vision application without asking you anything, they have either done this exact job many times before or they are guessing. Usually it is the second.
Silence on lighting. Lighting makes or breaks a vision system. A proposal that does not mention it has quoted the easy part and left the hard part as your problem.
A guaranteed result with no test. Accuracy figures promised on a datasheet mean little until the system has seen your actual parts. Be wary of a guarantee that does not come with a trial on your own samples.
One product for everything. A response that answers every requirement with the same camera or the same software, whatever the application, is selling what it has rather than what you need.
A headline price with the detail missing. A low number on the front page, with the integration, lighting and commissioning quietly left out, is not a cheaper system. It is an incomplete quote that grows later.
No word on support or obsolescence. A vision system lives on a line for years. If a proposal says nothing about support, spares or what happens when a part is discontinued, it is only quoting the day you buy it.
How we try to help buyers buy better
We sit on the receiving end of these documents, which means our view is shaped by thousands of them. The pattern is clear. The buyers who end up with the best systems are not the ones with the biggest budgets. They are the ones who described their problem well and tested before they committed.
That is the part we care about most. We would rather help you specify the right system than win a vague tender with the wrong one. We are engineering-led rather than catalogue-led, which means the advice you get before an order comes from people who have actually built and run these systems. If a simpler or cheaper approach will do the job, we will say so, even when it means a smaller order for us.
In practice that means a few things. We will help you turn a rough idea into a specification that any supplier can quote properly, not only us. We prove a system on your own samples in our Insights Lab before you commit to it. We run the harder applications, deep learning classification, 3D bin picking and precision measurement, as working demonstrations in our Experience Centre, where you can see the real thing instead of a brochure. The aim is a system that still looks like the right decision three years after it goes in.
Book a specification review
If you are about to write a machine vision RFP, or you are holding a stack of quotes that do not line up, we can help you make sense of it. We will help you sharpen the specification before it goes out, or sanity-check the responses you have already received. To book a specification review, get in touch with our team.
Get in touch at info@clearview-imaging.com or call +44 (0)1844 217270
Related reading Machine vision engineering services, what to expect to pay | Machine Vision and AI, separating hype from reality | Embedded Vision vs Traditional Cameras | Hyperspectral Imaging vs Standard Machine Vision | Contact
